Photovoltaic Plant Potrero Solar

296 MW

DESCRIPTION

The contract is under the Full EPC modality, including engineering, construction of the plant and a 400 KV substation, as well as operation and maintenance (O&M) for the first two years of the plant’s life.

 

The plant’s output is 750 GWh per year, which is equivalent to the annual consumption of more than 350,000 Mexican households. With full operation of Potrero Solar, the emission of 345,000 tonnes of CO2 into the atmosphere each year will be avoided.

INSTALLED POWER CAPACITY

296 MW

LOCATION

Jalisco, México

PANELS

795.600

CLIENT

FRV

EXTENSION

640 ha

Photovoltaic Plant
Nova Olinda

292 MW

proyectos-prodiel6

Photovoltaic Plant
Sol del Desierto

244 MW

proyectos-prodiel7

Photovoltaic Plant
La Isla

182,5 MW

proyectos-prodiel8

Photovoltaic Plant
Andes Solar IIB

180 MW