The contract is under the Full EPC modality, including engineering, construction of the plant and a 400 KV substation, as well as operation and maintenance (O&M) for the first two years of the plant’s life.
The plant’s output is 750 GWh per year, which is equivalent to the annual consumption of more than 350,000 Mexican households. With full operation of Potrero Solar, the emission of 345,000 tonnes of CO2 into the atmosphere each year will be avoided.
296 MW
Jalisco, México
795.600
FRV
640 ha