Don Rodrigo photovoltaic project is located between the towns of Alcalá de Guadaíra and Utrera, in the province of Seville (Spain).
It has installed capacity of 175 MW and it can generate over 300 GWh a year, equivalent to the annual consumption needs of 93,000 homes, thereby avoiding the discharge into the atmosphere of more than 198,000 tonnes of CO2 a year.