Bolero involves of a photovoltaic plant comprising 288.266 panels with a installed capacity of 86 MW. The project will employ a máximum of 273 workers during the construction stage and 15 permanent staff when in operation.
The project was initially submitted as Laberinto, which entailed two plants (now Bolero Este and Bolero Oeste) located side by side to be developed simultaneously.