Pastora Electricity Substation
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new booster substation.
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new booster substation.
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new panel of the Carrera Pinto substation, with solution by means of “PASS” hybrid equipment.
Construction of a single Simplex Circuit high-voltage line, 3 Km in length and at 220 kV, with numerous crossings.