PROJECT
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new panel of the Carrera Pinto substation, with solution by means of “PASS” hybrid equipment.
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new panel of the Carrera Pinto substation, with solution by means of “PASS” hybrid equipment.