Pastora Electricity Substation
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new booster substation.
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new booster substation.
The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new panel of the Carrera Pinto substation, with solution by means of “PASS” hybrid equipment.
Construction of a single Simplex Circuit high-voltage line, 3 Km in length and at 220 kV, with numerous crossings.
PRODIEL is currently responsible for the Operation and Maintenance of approximately 1.25 GW worldwide.
Located in Santiago (Chile), it has installed capacity of 160 MW and can generate over 400 GWh a year.